Solar panels and charging poles at campsite Sie Es An in Balkbrug

Shift to Solar realised a renewable energy solution in early June 2025 at Camping Sie Es An in Balkbrug. On the flat roof of one of the buildings are 49 solar panels of 450 Wp placed. This was followed later in the month by the installation of six charging stations on the premises.

The charging stations are all linked to a back office system. As a result, charging is automatically charged on a business basis, making management for the campsite simple and efficient.

Renewable energy and smart mobility

The 49 solar panels are expected to 19,300 kWh generated per year. This provides a CO₂ savings of 4.25 tonnes per year. That is equivalent to about Driving 28,300 kilometres with a petrol car Whether the annual planting of around 212 trees.

Thanks to the combination of solar energy and charging facilities, Camping Sie Es An is taking a big step towards a future-proof and sustainable holiday park.

Need help with your solar solution?
We will be happy to help you! Contact us with no obligation and receive a tailor-made quotation.

Need help with your Solar solution?

We are happy to help you! Contact us without obligation and get a tailor-made offer
Jari
Employee Shift to Solar
Project information
Number of solar panels: 49 × 450 Wp
Location: Balkbrug, Overijssel
Flat roof with 49 solar panels and 6 charging stations, linked to back office system
Completion date: 6 June 2025
CO₂ saved: 4.25 tonnes per year (≈ 28,300 km petrol car or 212 trees)
Expected annual production: 19,300 kWh
Share
Related projects
© 2025 Shift to Solar - Made by Tatof.nl Privacy terms |
Request a quote You can also request a quote directly from us. We will get back to you with a matching offer within 5 days. Quotations are valid for 14 days after receipt.

"*" indicates required fields

Interested in (not required)
This field is for validation purposes and should be left unchanged.
Change language