3
| Number of solar panels: 16 × 450 Wp | |
| Location: Heerhugowaard | |
| Solar bicycle shed with 16 solar panels and 4 charging boxes (16 bicycle charging points) | |
| Completion date: 9 July 2025 | |
| CO₂ saved: 1.39 tonnes per year (≈ 9,250 km petrol car or 69 trees) | |
| Expected annual production: 6,300 kWh |
4
| Number of solar panels: 49 × 450 Wp | |
| Location: Balkbrug, Overijssel | |
| Flat roof with 49 solar panels and 6 charging stations, linked to back office system | |
| Completion date: 6 June 2025 | |
| CO₂ saved: 4.25 tonnes per year (≈ 28,300 km petrol car or 212 trees) | |
| Expected annual production: 19,300 kWh |
3
| Number of solar panels: 16 × 375 Wp glass-glass panels | |
| Location: Rijssen, Overijssel | |
| Two Solar bicycle stands made of steel with integrated solar panels | |
| 2022 | |
| CO₂ saved: 3.0 tonnes per year (≈ 20,000 km of petrol car or 142 trees) | |
| Expected annual production: 6,000 kWh (3,000 kWh per shed) |
1
| 42 solar panels | |
| Zwolle, Overijssel | |
| Steel porch 16 metres wide | |
| Completion: 16-01-2025 | |
| Saving: 6.3 tonnes of CO₂ per year (≈ 252 trees or 37,040 km in a petrol car) | |
| Expected annual production: 15,449 kWh |
1
| 9 solar panels of 440 Wp | |
| Den Helder | |
| 28 January 2025 | |
| COâ‚‚ saved: 1.35 tonnes per year | |
| Expected annual production: 3,366 kWh per year |
7
| 20 450 Wp solar panels | |
| Ghent | |
| 17 December 2024 | |
| COâ‚‚ saved: 9.94 tonnes per year (equivalent to 456 trees planted) | |
| Expected annual production: 8,100 kWh per year | |
| Space for 28 bicycles |
4
| Number of solar panels: 16 × 375 Wp glass-glass Denim panels | |
| Location: Zwolle, Overijssel | |
| Two solar bicycle shelters with integrated e-bike charging facilities and mains connection | |
| 2023 | |
| CO₂ saved: 3.0 tonnes per year (≈ 20,000 km of petrol car or 142 trees) | |
| Expected annual production: 6,000 kWh (3,000 kWh per shed) |
6
| 51 420 Wp glass-glass solar panels | |
| Strijen | |
| Suitable for 7 parking spaces | |
| 11 November 2024 | |
| COâ‚‚ saved: 9.94 tonnes per year (equivalent to 456 trees planted) | |
| Expected annual production: 19.86 MWh |